It took about 3 days for the floor to go in.  The men had to carry up these 26 foot long 6x18" beams.  Very large and heavier than you can imagine.  I'm not sure where I was because I have no pictures of the men carring these beasts up.
It took another two days to build the first wall.  The first wall was built in ONE piece.  The men had to use wall jacks to get it up.  I imagine it was extremely heavy.

This is the end of the hallway and the second wall to go up.